FIDIC - A Guide for Practitioners
Description:
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer’s Representative as one of the parties.
Low Price Summary
Top Bookstores
DISCLOSURE: We're an eBay Partner Network affiliate and we earn commissions from purchases you make on eBay via one of the links above.
Want a Better Price Offer?
Set a price alert and get notified when the book starts selling at your price.
Want to Report a Pricing Issue?
Let us know about the pricing issue you've noticed so that we can fix it.