Construction Scheduling: Preparation, Liability, and Claims (Construction Law Library)
0471532231
9780471532231
Description:
1 HARDCOVER BOOK, NO DUST COVER
Best prices to buy, sell, or rent ISBN 9780471532231
Frequently Asked Questions about Construction Scheduling: Preparation, Liability, and Claims (Construction Law Library)
The price for the book starts from $55.83 on Amazon and is available from 4 sellers at the moment.
If you’re interested in selling back the Construction Scheduling: Preparation, Liability, and Claims (Construction Law Library) book, you can always look up BookScouter for the best deal. BookScouter checks 30+ buyback vendors with a single search and gives you actual information on buyback pricing instantly.
As for the Construction Scheduling: Preparation, Liability, and Claims (Construction Law Library) book, the best buyback offer comes from and is $ for the book in good condition.
The Construction Scheduling: Preparation, Liability, and Claims (Construction Law Library) book is in very low demand now as the rank for the book is 8,155,648 at the moment. A rank of 1,000,000 means the last copy sold approximately a month ago.
Not enough insights yet.